The installation of the anchor rim gac is one of the most popular and necessary tuning for inflatable swimming aids. It is this small but critical element that allows you to securely lock the boat in the current or wind, freeing the fishermen's hands for other tasks. Without high-quality anchoring, the anchor system becomes a source of constant danger, as an unsecured tangle can become entangled in the propeller or cause the boat to tip over.
Modern models of rims, often called "fishing beaks", are designed with the specifics of the soft side of PVC. They are not just attached to the cylinder, but also provide a quick anchor drop in an emergency. Security And the water is very much affected by the way you choose the installation site and the method of fixation that you use, and you can get a failure to install it, and you can depressurize the balloon or you can lose an expensive anchor.
In this article, we will discuss in detail the process of self-mounting anchor ditch, from the choice of location to the final sealing. You will learn what tools will be required for the work, how to properly prepare the surface and why it is important to consider the direction of thrust of the anchor rope.
Selection of installation site and surface preparation
The first and most important step is to determine the optimal point for the rim-gac installation, and most often, the installation is done in the bow of the boat, strictly in the center of the diametrical section, to ensure that the tension of the anchor symmetry is symmetrical. However, if the boat is used primarily for spinning fishing with a sonar, it sometimes makes sense to move the mount closer to one of the sides so that the rope does not interfere with the sensor.
The surface of the PVC should be completely clean and defatted before work begins. Any dirt, dust or moisture under the adhesive layer will detach the site at the most inopportune time. Use special PVC degreasers or isopropyl alcohol, thoroughly cleaning the site of the future installation.
When marking, it is important to consider not only aesthetics, but also functionality. keelMake sure that the chosen location does not block access to the keel or its valves, and also make sure that when the anchor rope is stretched, it does not rub against the sharp corners of the fittings or transom.
โ ๏ธ Warning: Never place the rum directly on the joint seam of cylinders or on the glue of stringers without reinforcement.
Required tools and materials
The minimum toolkit that any home craftsman can use to get the job done is the right adhesive, because universal adhesives may not provide the proper adhesion to polyvinyl chloride, and it's best to use two-component polyurethane adhesives specifically designed for PVC materials.
In addition to the glue and the rim gack itself, you'll need a dryer to heat the surface. Heating activates the molecular bond between the adhesive and the boat material, making the joint monolithic. Also prepare a roller to roll to remove air bubbles from under the mounting site.
- ๐ ๏ธ Toolkit: scissors, marker, ruler, degreaser.
- ๐งด Expendables: two-component PVC glue, wiping fabric.
- ๐ฅ Equipment: building hair dryer (or powerful household), rolling roller.
If you plan to install a bolt-mounted rift (through), the tool list will expand, you will need a drill with a thin drill, a PVC sealant and a set of keys. Bolt mount is considered more reliable for heavy anchors, but requires more care when drilling.
The technology of gluing the overhead rim-gac
The gluing process begins with fitting, apply it to the marked area and make sure it is flat. Then apply the marking with a pencil or a washable marker, and then the surface of the balloon and the back of the pit must be cleaned with fine sandpaper (granularity 200-400) to create roughness.
The next step is to apply the glue, and the adhesive is applied in a thin layer on both surfaces that are glued together, and the important thing is to let the first layer dry to "slip" (usually 10-15 minutes), and then the second layer is applied, and the second layer is activated by heating and provides the main adhesion.
After the second layer is applied and dried briefly, the surfaces are heated with a hair dryer to a temperature of about 50-60 degrees. The plastic should become warm to the touch, but not melt. Then the crum is pressed tightly against the cylinder and carefully rolled from the center to the edges, squeezing out the excess air.
โ ๏ธ Warning: Do not load the boat immediately after gluing. Complete glue polymerization takes 24 to 72 hours depending on air temperature and humidity.
Installation of end-to-end mounting with bolts
Through mounting is the most reliable option for large boats and heavy anchors, in which case the rim-gac is fixed not only by glue, but also by bolts passing through the PVC fabric. To implement this method, special rim-gacs with a wide support washer or pad are used.
The drilling of the hole is the most critical thing. The hole must be the minimum necessary bolt diameter to ensure a tight fit. The edges of the hole must be treated with a sealant before installing the bolt, which prevents moisture from entering between the layers of the fabric of the metal.
When tightening bolts, it is important to keep balance. Excessive force can deform or break through the fabric, and a weak puff will lead to a backlash and gradual destruction of the hole. Use large diameter washers on the inside of the cylinder to distribute the load.
| Type of attachment | Maximum loading | Difficulty of installation | Risk of damage |
|---|---|---|---|
| Invoice (glue) | 15 kg | Low. | Minimum |
| Through (bolts) | up to 50 kg and above | High. | Medium (drilling) |
| Combined | Maximum | Medium | Low. |
The combined method combining the adhesive of the site and the bolt connection is considered to be gold-standard It eliminates the cutting of bolts under lateral load and guarantees tightness due to the adhesive layer.
Sealing and protection of compounds
Regardless of the method of attachment chosen, sealing issues remain a priority. Water trapped under the base of the squirrel can lead to PVC tissue stratification and mold development. Therefore, it is recommended that the perimeter of the glued site be additionally passed with a layer of liquid PVC or a special sealant.
If a bolt connection, bolt head and nut on the inside are used, it is also desirable to treat with a protective composition, this is especially true for boats that are stored assembled or in high humidity conditions.
Regular inspection of the mounting site will help to identify incipient problems in time, pay attention to the appearance of bubbles, detachments of the edges or changes in the color of the material around the frock, timely elimination of minor defects will prevent major accidents on the water.
Operation and safety on water
A well-placed rim-gak is not a guarantee of safety. It is important to understand the physics of the anchoring process. In strong currents or winds, the load on the anchoring point can increase many times. The thrust of a boat at anchor creates dynamic loads that significantly exceed the static weight of the anchor.
Use the anchor end (fal) with a shock absorber or use an elastic cable. This will smooth the jerks and reduce the load on the poop and the side of the boat. Never tie the phalan tightly if there is a risk of abrupt changes in conditions (tide, boat passage), always have the ability to quickly drop anchor.
- ๐ Tension control: make sure that the angle of escape of the fail from the rimmer is not too sharp, this creates a cutting load.
- ๐ซ Avoid overloading.Do not use boat rumps to tow other boats or lift heavy loads.
- ๐งน Gone.After the season, lubricate the moving parts of the pomace mechanism (if any) with silicone lubrication.
โ ๏ธ Warning: When anchoring from an inflated boat, always draw the anchor from the nose along the current or wind. Anchor cast from the stern or from the side with strong thrust can lead to the boat turning over.
Frequently Asked Questions (FAQ)
Can I put a cold coat on the floor without a hair dryer?
Using a dryer is critical to activating the adhesive and ensuring molecular adhesion. Cold glue is only possible with special single-component adhesives, but the strength of such a connection will be much lower, especially at low water temperatures.
How long can I take the boat to the water?
The minimum drying time is 24 hours at room temperature, but to gain full strength and achieve the declared water resistance specifications, manufacturers are recommended to withstand the product up to 72 hours.
How much weight will a standard rim-gac hold?
Most plastic rim-hacs, glued to technology, designed to work with anchors weighing up to 10-15 kg. For heavier anchors (20 kg and above), it is highly recommended to use a through bolt mount with a reinforced platform.
Do I need to be stored in winter?
If the rum is properly installed, it does not need to be removed, but the boat should be kept in a straightened state or rolled up in free folds, so that a permanent cloth hall does not form at the place of attachment of the rum, which can lead to microcracks.